Home Sverige
  Lösningar
Produkter
Support - Service
Nyheter
Om oss
Lokalt
Kontakta   Sverige
 
Lösningar  
 
Cadastral
 
 
Engineering
 
 
 HDS Workflows
 
 
 Roads
 
 
 Railways
 
 
 Tunnel surveys
 
 
 Bridges
 
 
  Bridge world record - Millau
 
 
  World Record Arch Bridge
 
 
  Old Suspension Pipeline
 
 
  Colorado DOT Project
 
 
  PennDOT Bridge
 
 
  Build a New Landmark
 
 
  Overpass construction
 
 
  Tsing Ma bridge - Hong Kong
 
 
  Øresund Bridge - Denmark
 
 
  Yang-Pu bridge - Shanghai
 
 
  Akashi Strait suspension
 
 
  Moving a railway bridge
 
 
  Deformation monitoring
 
 
 Large Building Construction
 
 
 Airports and Stadiums
 
 
 Harbours and Docks
 
 
 Water Supplies
 
 
 Sewage collection
 
 
 Plants & Refineries
 
 
Monitoring
 
 
Building & Construction
 
 
Mining & Exploration
 
 
Asset & Facilities Mgmt
 
 
Agriculture
 
 
Aerospace
 
 
Automotive
 
 
General Industry
 
 
Other
 

Moving a railway bridge

Automated control when moving a bridge
A Leica TCA 1800 automatic target recognizing precision total station, controlled by the Leica APS Win Software, was in use when a bridge was moved by 23 metres below the Inter City Express main rail axis Mannheim-Frankfurt. This work on the Mannheim- Blumenau railway line was carried out by the Mannheim office of Bilfinger + Berger Bauaktiengesellschaft.
The surveyor responsible for the measured control of the undertaking H. P. Echsle, describes this operation for our readers.

Click to download Moving a railway bridge (PDF, 179 KB) (PDF, 179.31 KB)
 
 
  Produkter
 
System 2000.
TCA1800 / TCA2003 / TC2003 Totalstationer  läs mer